WELLINGTON ST N | MAJOR ST to LANCASTER ST W | Reason: Watermain Break
|
TOP |
Street name | From / To | Reason / Details |
WELLINGTON ST N
(Sidewalk closure) |
MAJOR ST to LANCASTER ST W | Reason: Watermain Break
|
TOP |
Street name | From / To | Reason / Details |
TOP |
Street name | From / To | Reason / Details |
EDGEHILL DR - No Through Traffic | BAXTER PL to PIONEER TOWER RD | Reason: Water Repair Date: 2025-Jul-15 to 2025-Jul-16 Details: Edgehill Dr/Marquette Dr to be closed beginning Tuesday, July 15 for approximately two (2) days for a water infrastructure replacement. No through traffic near #276 Edgehill - local access via Baxter Pl or Pioneer Tower Rd. Contact: Steven Ryder 519-783-8968 |
TOP |
Street name | From / To | Reason / Details |
ANN ST - Local Access Only | END to FIFE AVE | Reason: Road Reconstruction
Details: Ann St / Fife St / Becker St to be closed for a road reconstruction project by the City of Kitchener. Local access will be made available as often as possible as the closures will shift periodically depending on the stage of the project. **CURRENT CLOSURES: Ann St - Frederick to Fife, Fife - Bruce to Becker** Date: 2025-Jan-01 to 2026-Sep-30 Detour: n/a Contact: Steven Ryder 519-783-8968 Alternate contact: Brent Garcia (519) 783 8139 |
BLUERIDGE AVE - No Through Traffic | LAKESIDE DR to QUEENS BLVD | Reason: Utility Work
Details: Blueridge Ave to be closed at Queens Blvd beginning on Monday, July 14 for approximately two (2) days for gas utility work. No access from Queens, local access from Lakeside. Date: 2025-Jul-14 to 2025-Jul-15 Contact: Steven Ryder 519-783-8968 |
Bleams Rd(4) | Amand Dr to Commonwealth St | Reason: Road Reconstruction (REGION)
Details: Closed. No Access. Date: 2025-Jun-09 to 2025-Jul-31 Contact: David Di Pietro - ddipietro@regionofwaterloo.ca - 519-504-5982 |
Bleams Rd(4) | Amand Dr to Trussler Rd | Reason: Road Reconstruction (REGION)
Details: Closed. No Access. Date: 2025-Mar-06 to 2025-Aug-01 Detour: Trussler Road to Ottawa Street South to Fischer-Hallman Road Contact: David Di Pietro - ddipietro@regionofwaterloo.ca - 519-504-5982 |
Block Line Rd Homer Watson Blvd - Lane Reduced | Kingswood Dr to Block Line Rd | Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-07 to 2025-Oct-16 Contact: Imran Alam - ialam@regionofwaterloo.ca |
Bridge St E(52) - Partially Closed | Bridge St W(52) to Tyson Dr | Reason: Bridge Work (REGION)
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-10 to 2025-Sep-19 Contact: Adam Galezowski - agalezowski@regionofwaterloo.ca |
CONNAUGHT ST - Local Access Only | NINTH AVE to TRAYNOR AVE | Reason: Road Reconstruction
Details: Connaught St - from Ninth Ave to Traynor Ave - will be closed for a road reconstruction project beginning in May 2025 until September 202. Residential access will be maintained as much as possible. Intermittent closures of intersection of Ninth Ave & Connaught St will occur, local traffic will have access from Kingsway or Greenfield. Date: 2025-May-01 to 2025-Sep-30 Detour: Traynor-Greenfield-Ninth-Connaught Contact: Steven Ryder 519-783-8968 Alternate contact: Eric Costa 519-783-8313 |
Charles St W(64) - Lane Reduced | Francis St S to Victoria St S(55) | Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jan-01 to 2025-Dec-31 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
FRANCIS ST S | HALLS LANE W to CHARLES ST W | Reason: Other
Details: CLOSURE FOR NEW DEVELOPMENT CONSTRUCTION 30 FRANCIS ST S - TEKTOWER Date: 2022-Oct-31 to 2026-Sep-30 Contact: Steven Ryder 519-783-8968 Alternate contact: SPECTRA CONTRACTING 519-594-8868 |
FREDERICK ST - Local Access Only | BRUCE ST to RIVER RD E | Reason: Road Reconstruction
Details: Frederick St Road Reconstruction project (Year 2) is beginning March 31 with the construction limits currently from Bruce St to River Rd E. Local access will be maintained as much as possible, but contractor will require full road closures at certain stages of the construction. Date: 2025-Mar-31 to 2025-Oct-31 Detour: Bruce-Victoria-River Contact: Steven Ryder 519-783-8968 Alternate contact: Licinio Costa 519-783-8314 |
FREDERICK ST - Local Access Only | RIVER RD E to TURNER AVE | Reason: Road Reconstruction
Details: Frederick St - from River Rd E to Turner Ave - closed as part of City of Kitchener road reconstruction project (Q24-006). Local access to properties via Turner/Frederick/Victoria. **No access from River Rd E as intersection is currently closed** Date: 2025-Jul-07 to 2025-Oct-31 Detour: Bruce - Victoria - Frederick Contact: Steven Ryder 519-783-8968 Alternate contact: Licinio Costa (519) 783 8314 |
Fairway Rd N(53) - Partially Closed | Upper Mercer St to Lackner Blvd(54) | Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-02 to 2025-Aug-29 Contact: Luke Misurka - lmisurka@regionofwaterloo.ca - 519-570-6383 |
Francis St S And Charles St W - Lane Reduced | Unspecified (Intersection) | Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Apr-16 to 2025-Aug-01 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
GOUDIES LANE | QUEEN ST N to FREDERICK ST | Reason: Other
Details: FULL CLOSURE OF GOUDIES LANE - for construction of 22 Frederick St. Lane access only for scheduled deliveries. Date: 2024-Aug-26 to 2025-Dec-01 Contact: Steven Ryder 519-783-8968 |
HALLS LANE W - Partially Closed | VICTORIA ST S to FRANCIS ST S | Reason: Other
Details: CLOSURE FOR NEW DEVELOPMENT CONSTRUCTION 30 FRANCIS ST S - TEKTOWER- access via Victoria St end only one way operations NO ACCESS VIA FRANCIS ST END Date: 2022-Oct-31 to 2026-Sep-30 Contact: Steven Ryder 519-783-8968 |
King St E Shantz Hill Rd(8) - Lane Reduced | Limerick Dr to Preston Pky | Reason: Road Resurfacing (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Apr-10 to 2025-Sep-01 Contact: MTO - Call 511 |
Manitou Dr(69) Bleams Rd(4) - Lane Reduced | Bleams Rd(4) (Intersection) | Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-02 to 2025-Jul-31 Contact: Jason Lane - jlane@regionofwaterloo.ca - 226-749-4189 |
NORTH DR - Local Access Only | HIGHLAND RD W to SPADINA RD W | Reason: Road Reconstruction
Details: North Drive is closed between Highland and Spadina due to the Admiral/Marlborough/Roxborough road reconstruction project until the end of August. No Through Traffic at intersection with Marlborough, local access via Highland and Spadina. Date: 2025-Jul-07 to 2025-Aug-29 Contact: Steven Ryder 519-783-8968 Alternate contact: Jeff Riedl (519) 783 8892 |
New Dundee Rd(12) - Lane Reduced | Reichert Dr to Pinnacle Dr | Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-08 to 2025-Aug-08 Contact: Romeo Uy - ruy@regionofwaterloo.ca - 226-749-0323 |
OLYMPIC DR - Local Access Only | PATTANDON AVE to HOFFMAN ST | Reason: Road Reconstruction
Details: Olympic Drive will be closed beginning Tuesday, May for a road reconstruction project from Pattandon to Hoffman. Tentative end date is October 31, 2025. Contractor to maintain access to driveways as much as possible. Date: 2025-May-20 to 2025-Oct-31 Contact: Steven Ryder 519-783-8968 |
Ottawa St N(4) And 7 W Off To Ottawa St N S - Lane Reduced | Unspecified (Intersection) | Reason: Site Servicing (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-07 to 2025-Jul-16 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
Ottawa St S(4) - Lane Reduced | Fischer-Hallman Rd(58) to Mowat Blvd | Reason: Utility Work (REGION)
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jan-06 to 2025-Aug-29 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
Ottawa St S(4) - Lane Reduced | Fischer-Hallman Rd(58) to Westmount Rd E(50) | Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-May-12 to 2026-Jan-01 Contact: Jason Guan - Email: jguan@regionofwaterloo.ca - 519-503-5684 (Primary) |
Ottawa St S(4) | Westmount Rd E(50) to Pinedale Dr | Reason: Road Reconstruction (REGION)
Details: Closed. No Access. Date: 2025-Jul-07 to 2025-Sep-19 Detour: Westmount Road to Fischer-Hallman Road Contact: Jason Guan - Email: jguan@regionofwaterloo.ca - 519-503-5684 (Primary) |
RIVER RD E
(Intersection closure) |
FREDERICK ST to RIVER RD E | Reason: Road Reconstruction
Details: River Rd E & Frederick St intersection to be closed to all vehicle traffic beginning July 9, 2025 for approximately four (4) months as part of Frederick St road reconstruction project by the City of Kitchener. Date: 2025-Jul-09 to 2025-Nov-14 Detour: Bruce - Victoria - Frederick OR Krug - East - Frederick Contact: Steven Ryder 519-783-8968 Alternate contact: Licinio Costa (519) 783 8314 |
SHANLEY ST - Lane Reduced | DUKE ST W to WATERLOO ST | Reason: Other
Details: Shanley St - between Duke St W and Waterloo St - Westbound lane closed until December 26, 2025 for ongoing construction at 152 Shanley St. Eastbound lane towards Duke St W remains open to vehicles. Date: 2025-Jan-01 to 2025-Dec-26 Contact: Steven Ryder 519-783-8968 |
Victoria St N(55) - Lane Reduced | Weber St W(8) (Intersection) | Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-14 to 2025-Jul-18 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
WILSON AVE - No Through Traffic | EIGHTH AVE to TRAYNOR AVE | Reason: Road Reconstruction
Details: Wilson Ave Reconstruction (Year 2) - Ninth to Traynor - begins Wednesday, April 22. Local access will be maintained as much as possible. Expect delays. Date: 2025-Apr-22 to 2025-Nov-28 Detour: Traynor-Greenfield-Franklin-Wilson Contact: Steven Ryder 519-783-8968 Alternate contact: Eric Costa 519-783-8313 |
Weber St E(8) - Lane Reduced | Dellroy Ave to Euler Ave | Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jan-16 to 2025-Jul-16 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
Weber St E(8) - Lane Reduced | Wilfred Ave to Dellroy Ave | Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-14 to 2025-Jul-25 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
Westmount Rd E(50) - Lane Reduced | Ottawa St S(4) to Laurentian Dr | Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Apr-14 to 2025-Oct-03 Contact: Jason Guan - Email: jguan@regionofwaterloo.ca - 519-503-5684 (Primary) |
Westmount Rd E(50) - Lane Reduced | Queens Blvd (Intersection) | Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-10 to 2025-Jul-28 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
Westmount Rd W(50) - Lane Reduced | Overlea Dr (Intersection) | Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Date: 2025-Jul-10 to 2025-Jul-18 Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
TOP |
Street name | From / To | Reason / Details |
Bleams Rd(4) - Lane Reduced | Manitou Dr(69) (Intersection) | Reason: Utility Work (REGION) Date: 2025-Jul-21 to 2025-Jul-28 Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Contact: Jason Lane - jlane@regionofwaterloo.ca - 226-749-4189 |
DUKE ST W - No Through Traffic | VICTORIA ST N to BREITHAUPT ST | Reason: Utility Work Date: 2025-Aug-11 to 2025-Sep-26 Details: Duke St W between Victoria and Breithaupt will be closed beginning on Monday, August 11 for approximately seven (7) weeks for gas utility work related to the rail corridor. The road will be closed at Victoria with no through traffic. Local access to properties north of the rail corridor will be maintained via Breithaupt St. Detour: Victoria-King-Breithaupt Contact: Steven Ryder 519-783-8968 |
DUMFRIES AVE | FREDERICK ST to KRUG ST | Reason: Road Reconstruction Date: 2025-Jul-17 to 2025-Jul-17 Details: Dumfries Ave and Chapel St. intersection will be closed for 1 day from 7 am to 5 pm. Contact: Dinesh Dhamotharan 519-783-8884 Alternate contact: Rob- 519-897-2816 |
HIGHLAND RD E - No Through Traffic | STIRLING AVE S to MAUSSER AVE | Reason: Road Repair Date: 2025-Jul-16 to 2025-Jul-16 Details: Highland Rd E to be closed between Stirling Ave and Mausser Ave on Wednesday, July 16 for a one (1) day road repair. No Through Traffic at #279, local access to homes and businesses via Stirling. Detour: Stirling-Mill-Heiman Contact: Steven Ryder 519-783-8968 |
KING ST W | COLLEGE ST to YOUNG ST | Reason: Special Event Date: 2025-Jul-19 to 2025-Jul-19 Details: King St W - between Young & College - to be closed on Saturday, July 19 for AFROVIBES event. Closed by 7AM on will re-open at 1AM on Sunday July 20. Contact: Steven Ryder 519-783-8968 |
Ottawa St S(4) And Fischer-Hallman Rd(58) - Lane Reduced | Unspecified (Intersection) | Reason: Utility Work (REGION) Date: 2025-Jul-18 to 2025-Jul-18 Details: Two-way traffic maintained with Paid Duty Officer flagging operation; pedestrian traffic maintained around work zone Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
QUEENS BLVD - No Through Traffic | WESTMOUNT RD E to CECILE DR | Reason: Road Repair Date: 2025-Jul-21 to 2025-Jul-22 Details: Queen's Blvd to be closed between Westmount Rd E and Cecile Dr on Monday, July 21 for a one (1) day road repair. No Through Traffic at #1307 Queens. Local access for residents will be maintained from Cecile and from Westmount. Tuesday, July 22 is a scheduled rain date should it be required. Detour: Westmount-Greenbrook-Fischer Hallman-Queens Contact: Steven Ryder 519-783-8968 |
Weber St E(8) - Lane Reduced | Dellroy Ave to Euler Ave | Reason: Other (REGION) Date: 2025-Jul-16 to 2025-Dec-18 Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone. Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066 |
TOP |
For inquiries regarding road closures, please contact Steven Ryder at 519-783-8968 (Transportation Planning).
- Planning any road work or a special event on a City road? Visit our road occupancy or work permit page