View larger version in a new window/tab
Road Openings
Street nameFrom / ToReason / Details
TOP
New Road Closures
Street nameFrom / ToReason / Details
HOWE DR - Lane Reduced WINDALE CRES TO END Reason: Water Repair
Date: 2021-Nov-29 to 2021-Dec-01
Details: LOCAL ACCESS MAINTAINED
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
King St E - Partially Closed Stonegate Dr (Intersection) Reason: Utility Work (REGION)
Date: 2021-Dec-01 to 2021-Dec-01
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
Manitou Dr - Partially Closed Cayuga Dr TO Homer Watson Blvd Reason: Utility Work (REGION)
Date: 2021-Nov-26 to 2021-Nov-29
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
ONTARIO ST N DUKE ST E TO WEBER ST E Reason: Sewer Work
Date: 2021-Nov-29 to 2021-Nov-30
Details: 2 day closure local access via Duke St end only no through traffic
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Ottawa St S - Partially Closed Nyberg St TO Dundas Ave Reason: Sewer Work (REGION)
Date: 2021-Nov-26 to 2021-Nov-30
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone.
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
SHELDON AVE N ROSEDALE AVE TO KING ST E Reason: Site Servicing
Date: 2021-Nov-29 to 2022-Jan-08
Tentative: Jan 8, 2022
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
Victoria St N - Partially Closed King St W (Intersection) Reason: Other (REGION)
Date: 2021-Dec-01 to 2021-Dec-02
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
WOODSIDE AVE QUEEN ST S TO END Reason: Storm work
Date: 2021-Nov-29 to 2021-Nov-29
Details: 1 day closure - local traffic only
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
TOP
Existing Road Closures
Street nameFrom / ToReason / Details
BELL LANE FRANCIS ST N TO WATER ST N Reason: Road Reconstruction
Details: Water St cycling lane installation - Bell Ln temporary two way access via Francis St end only
Date: 2021-Oct-12 to 2021-Dec-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
BELL LANE WATER ST N TO COLLEGE ST Reason: Road Reconstruction
Details: Water St N cycling lane installation - Bell Ln temporary two way access via College St end only
Date: 2021-Oct-12 to 2021-Dec-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
BOEHMER ST FAIRFIELD AVE TO UNION BLVD Reason: Road Reconstruction
Details: ROAD CLOSURE FOR RECONSTRUCTION
Date: 2021-Apr-14 to 2021-Nov-30
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
Alternate contact: Jeff Reidl PM 519-741-2200 x7812
BREITHAUPT ST MOORE AVE TO WATERLOO ST Reason: Crane operation
Date: 2021-Nov-04 to 2021-Dec-04
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
Borden Ave S - Partially Closed Bedford Rd (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-25 to 2021-Nov-26
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
CHARLES ST E SHELDON AVE S TO PRESTON ST Reason: Road Reconstruction
Details: 4 week closure - access to Rockway Golf course following wayfinding signs
Date: 2021-Sep-29 to 2021-Nov-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Licinio Costa PM 519-741-2200 x7132
COLLEGE ST BELL LANE TO KING ST W Reason: Other
Details: Closure from Bell Ln to King St only for City Hall Carl Zehr Square construction - local access only - fire access via Duke St end
Date: 2020-Mar-23 to 2022-Jun-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Lynda Stewart PM - 519-741-2600 x4215
Charles St W - Partially Closed Gaukel St (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-01 to 2022-Feb-01
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
DAVID ST COURTLAND AVE W TO JOSEPH ST Reason: Other
Details: full road closure at 51 David St - local access maintained no through traffic parking meters open, closure for new development construction
Date: 2021-Feb-26 to 2022-Aug-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Miomir Stefanovic - Zehr Group mstefanovic@zehrgroup.ca
DELTA ST SYDNEY ST S TO FLORAL CRES Reason: Other
Details: Local traffic only Charles to Floral - see attached https://lf.kitchener.ca/WeblinkExt/0/doc/1849964/Page1.aspx
Date: 2020-Jul-13 to 2021-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Aaron McCrimmon-Jones 519-741-2200 x7038
DODGE DR NEW DUNDEE RD (Intersection) Reason: Road Reconstruction
Details: Trunk Sewer, culvert replacement, sanitary services work, with local traffic maintained with driveway access NO THROUGH ACCESS SEPT 7 TO 13 2021
Date: 2021-Sep-07 to 2022-Mar-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
FLORAL CRES
(Intersection closure)
PRESTON ST TO CHARLES ST E Reason: Road Reconstruction
Details: intersection closure for 1 month Floral/Preston/Delta/Charles St
Date: 2021-Sep-29 to 2021-Nov-30
Detour: access to Rockway Golf course via wayfinding signs
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Licinio Costa PM 519-741-2200 x7132
Fairway Rd S - Partially Closed Wilson Ave TO Wabanaki Dr Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-22 to 2021-Nov-27
Contact: Saman Ajamzadeh - 519-575-4557 - Sajamzadeh@regionofwaterloo.ca
Fischer-Hallman Rd - Partially Closed Rockwood Rd TO Bleams Rd Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Apr-15 to 2021-Dec-24
Contact: Justin Armstrong - 519-575-4400 ext 3164
Frederick St - Partially Closed Duke St E TO Weber St E Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-25 to 2021-Nov-26
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
GAUKEL ST CHARLES ST W TO HALLS LANE W Reason: Site Servicing
Details: CLOSURE FOR NEW DEVELOPMENT CONSTRUCTION
Date: 2018-Aug-20 to 2022-Jun-30
Detour: VIA CHARLES ST TO WATER ST TO KING ST
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: ZEHR LEVESQUE - ROBEN MAGAR 519-576-2233
GAUKEL ST CHARLES ST W TO JOSEPH ST Reason: Other
Details: PERMANENT CLOSURE FOR PASSIVE SEATING
Date: 2020-May-01 to 2022-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: AARON MCRIMMON- JONES 519-741-2200 X7738
GUELPH ST ENGLEWOOD PL TO LANCASTER ST W Reason: Road Reconstruction
Details: closed, no through traffic.
Date: 2021-May-11 to 2021-Nov-30
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
HALLS LANE W WATER ST S TO GAUKEL ST Reason: Other
Details: site development construction closure - access via Water St end only - no through traffic
Date: 2019-Dec-18 to 2022-Jun-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Highland Rd W - Partially Closed Westheights Dr (Intersection) Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Sep-30 to 2021-Dec-17
Contact: John Stephenson - 519-575-4096
Highway 401 - Lane Reduced King Street Bypass TO King St E W To 401 W On Reason: Road Reconstruction (MTO)
Details: There is no impact on traffic. Highway 401 Westbound from Fountain Street to 0.5 kilometre East of Homer Watson Boulevard. Highway 401 Eastbound from 1 kilometre east of Homer Watson Boulevard to 0.5 kilometre west of King Street. Ramp from northbound King Street to Westbound Highway 401. Westbound - Lane reduction with temporary concrete barriers, crash trucks and construction signage. Speed reduced to 80 kilometres per hour. Width reduced to 4.0 metres. No height reduction. Eastbound - Lane reduction with temporary concrete barriers, crash trucks and construction signage. No speed reduction. Width reduced to to 6.5 metres. No height reduction. The ramp from northbound King street to westbound Highway 401 (South-West Ramp) will be closed for the remainder of 2021. November 19, 2021 - November 26, 2021
Date: 2021-Apr-01 to 2025-Jul-31
Contact: MTO 519-873-4372
Ira Needles Blvd - Partially Closed Victoria St S (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Sep-27 to 2021-Nov-30
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
JOSEPH ST - Partially Closed DAVID ST TO VICTORIA ST S Reason: Road Reconstruction
Details: cycling network construction - permanent westbound one way traffic David St to Victoria St only
Date: 2021-Apr-27 to 2021-Dec-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM - 519-741-2200 x7140
King St E - Partially Closed 401 W Off To King St E W TO Heldmann Rd Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Oct-29 to 2021-Dec-20
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
MAURICE ST OTTAWA ST S TO SYDNEY ST S Reason: Road Reconstruction
Details: road reconstruction
Date: 2021-Jul-05 to 2021-Dec-15
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Licinio Costa 519-741-2200 x7132
MORRISON RD KING ST E TO MANOR DR Reason: Other
Details: FULL CLOSURE NOV 25 & 26 to 29 FOR CONNECTIONS AND DEC1 & 2 FOR PAVING OPERATIONS Watermain replacement - westbound closure only - no access from King St
Date: 2021-Jul-19 to 2021-Dec-10
Detour: access via River Road to Grand River Boulevard to Morrison Rd to King St only - RIGHT ONLY EXIT AT KING ST
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
Manitou Dr - Partially Closed Courtland Ave E TO Bleams Rd Reason: Utility Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Oct-28 to 2021-Nov-30
Contact: Ken Renner - 519-584-5612 KeRenner@regionofwaterloo.ca
New Dundee Rd - Partially Closed Pinnacle Dr TO Robert Ferrie Dr Reason: Site Servicing (REGION)
Details: Two-way traffic maintained with flagging operation; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-15 to 2021-Nov-30
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
PETER ST COURTLAND AVE E TO ST GEORGE ST Reason: Road Reconstruction
Details: restorations from 2020 project local traffic maintained
Date: 2021-Oct-22 to 2021-Nov-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x 7140
SPADINA RD E - Lane Reduced EAST LANSDOWNE TO HIGHLAND RD E Reason: Other
Details: lane closure for new development construction, two way traffic maintained
Date: 2021-Jul-12 to 2021-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
SYDNEY ST S NYBERG ST TO KING ST E Reason: Road Reconstruction
Details: local traffic maintained
Date: 2021-Apr-12 to 2021-Dec-15
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Licinio Costa 519-741-2200 x7132
Sportsworld Dr - Partially Closed King St E (Intersection) Reason: Manhole Work (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2021-Nov-22 to 2021-Nov-26
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
THALER AVE MORGAN AVE TO FAIRWAY RD N Reason: Road Reconstruction
Date: 2021-Oct-05 to 2021-Nov-30
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
VANIER DR - Lane Reduced SIEBERT AVE TO TRAYNOR AVE Reason: Utility Work
Details: KW Hydro pole reline lane reductions
Date: 2021-Oct-18 to 2021-Dec-23
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
WATER ST N KING ST W TO DUKE ST W Reason: Road Reconstruction
Details: Water St cycling lane installations
Date: 2021-Oct-12 to 2021-Nov-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
WATER ST N KING ST W TO DUKE ST W Reason: Road Reconstruction
Details: closure for downtown cycling lane installations
Date: 2021-Oct-12 to 2021-Nov-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
WATER ST S CHARLES ST W TO JOSEPH ST Reason: Road Reconstruction
Details: southbound closure only for cycling lane installations
Date: 2021-Jul-30 to 2021-Dec-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
WATER ST S CHARLES ST W TO KING ST W Reason: Road Reconstruction
Details: southbound closure only for cycling lane installation
Date: 2021-Oct-12 to 2021-Dec-03
Detour: access to Halls Ln via Water St end to Gaukel St only
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
WENTWORTH AVE - Lane Reduced LANSDOWNE BLVD TO WENTWORTH AVE Reason: Site Servicing
Date: 2021-Nov-24 to 2021-Dec-03
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
TOP
Upcoming Road Closures
Street nameFrom / ToReason / Details
CEDAR ST S KING ST E TO CHARLES ST E Reason: Road Repair
Start:  Dec 6, 2021
Details: 3 DAY CLOSURE SOUTHBOUND CEDAR ST NO TURNS FROM KING ST
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
COMMONWEALTH ST SWARTZ ST TO COTTON GRASS ST Reason: Site Servicing
Start:  Nov 30, 2021
Details: 1 day closure
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
Homer Watson Blvd - Lane Reduced Huron Rd Off To Homer Watson Blvd TO Manitou Dr Reason: Utility Work (REGION)
Start:  Nov 26, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
KING ST E EBY ST N TO CEDAR ST N Reason: Road Repair
Start:  Dec 6, 2021
Details: 3 DAY CLOSURE EASTBOUND KING ST
Detour: VIA SCOTT ST
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Lancaster St W - Partially Closed 85 S Off To Lancaster St W (Intersection) Reason: Utility Work (REGION)
Start:  Nov 29, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
Lancaster St W Shirk Pl TO Bridge St E Reason: Manhole Work (REGION)
Start:  Nov 29, 2021
Details: Closed to through traffic; open to businesses and residences; pedestrian traffic maintained around work zone.
Detour: Eastbound Lancaster Street = Bridge Street (RR52) to University Avenue (RR57) to Weber Street (RR08) to Erb St/Bridgeport Rd (RR09) Westbound Lancaster Street = Bridgeport Road (RR09) to Weber Street (RR57) to University Avenue (RR57) to Bridge Street (RR52)
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
MANOR DR LEWIS CRES TO MORRISON RD Reason: Road Repair
Start:  Dec 1, 2021
Details: 1 day closure either Dec 1 or 2 for paving operations
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Brent Garcia PM 519-741-2200 x7140
NATCHEZ RD VICTORIA ST N TO ROTHSAY AVE Reason: Catchbasin Work
Start:  Dec 1, 2021
Details: 1 day closure
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Ottawa St N - Partially Closed King St E (Intersection) Reason: Other (REGION)
Start:  Dec 6, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Steven Sieunarine - 519-575-4030 - SSieunarine@regionofwaterloo.ca
PLAINS RD FISCHER HALLMAN RD TO TRUSSLER RD Reason: Storm work
Start:  Dec 2, 2021
Details: 1 day closure - work at 520 Plains Rd
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
SCOTT ST WEBER ST E TO SPETZ ST Reason: Site Servicing
Start:  Dec 1, 2021
Tentative: Dec 17, 2021
Contact: Lou Slijepcevic 519-741-2200 ext. 7153
Victoria St N - Partially Closed Edna St TO Bruce St Reason: ION Construction Work (REGION)
Start:  Nov 27, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Luke Misurka - 519-575-4738
Victoria St S - Partially Closed Park St TO Joseph St Reason: Other (REGION)
Start:  Dec 20, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
Victoria St S - Partially Closed Weichel St (Intersection) Reason: Utility Work (REGION)
Start:  Nov 30, 2021
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Kenneth Renner - 519-575-4400 ext 3302 - KeRenner@regionofwaterloo.ca
TOP

For inquiries regarding road closures, please contact Stephanie Brasseur at 519-741-2200 x 7373 (Transportation Planning).

  • Planning any road work or a special event on a City or Regional Road? You must have a permit.  Please complete the appropriate permit and forward for review. Details »

For information on:

in South Western Ontario, contact 1-800-268-4686.

For information on Regional Road Closures, please visit the following websites: