View larger version in a new window/tab
Road Openings
Street nameFrom / ToReason / Details
JUBILEE DR - Lane Reduced WATER ST S TO DAVID ST Reason: Storm work
Date: 2024-Apr-08 to 2024-Apr-19
ST LEGER ST - Lane Reduced BREITHAUPT ST TO VICTORIA ST N Reason: Other
Date: 2024-Apr-01 to 2024-Apr-19
TOP
New Road Closures
Street nameFrom / ToReason / Details
TOP
Existing Road Closures
Street nameFrom / ToReason / Details
AVALON PL - Lane Reduced SOUTHMOOR DR TO STIRLING AVE S Reason: Other
Details: intermittent lane closures/flagging operations two way traffic maintained for construction of Regional pedestrian bridge
Date: 2024-Jan-01 to 2024-Oct-29
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Andrew Doman PM Region of Waterloo 519-575-4400 x3183
BANKSIDE DR FISCHER HALLMAN RD TO EASTFOREST TRAIL Reason: Road Resurfacing
Details: road resurfacing local traffic only
Date: 2024-Apr-08 to 2024-May-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler 519-741-2200 x7605
BRUNSWICK AVE HARTWOOD AVE TO GUELPH ST Reason: Road Resurfacing
Details: closure for curb repairs, concrete and milling and resurfacing
Date: 2024-Apr-02 to 2024-May-03
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler PM 519-741-2200 x7605
CAMBRIDGE AVE KRUG ST TO SHERWOOD AVE Reason: Road Reconstruction
Details: closure at Sherwood Ave end only - local traffic via Krug St end only
Date: 2024-Apr-02 to 2024-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Eric Costa PM 519-741-2200 x7414
CHANDLER DR STRASBURG RD TO WOODFERN CRT Reason: Bridge Reconstruction
Details: Westbound closure only open one way only to through traffic -two way access to businesses and Kitchener Fire Dept and GRT- signing posted at Strasburg Rd at Ottawa St follow detour
Date: 2024-Feb-12 to 2024-Apr-21
Detour: Ottawa St via Elmsdale Dr to Chandler Dr
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Andrew Doman PM Region of Waterloo 519-575-4400 x3183
CHANDLER DR
(Sidewalk closure)
STRASBURG RD TO WOODFERN CRT Reason: Other
Details: west sidewalk closure for Regional pedestrian bridge construction
Date: 2024-Jan-01 to 2024-Oct-29
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Andrew Doman PM Region of Waterloo 519-575-4400 x3183
CONESTOGA COLLEGE BLVD - Lane Reduced HOMER WATSON BLVD TO OLD MILL RD Reason: Road Resurfacing
Details: two way traffic maintained with lane reductions for curb repairs, milling and resurfacing operations - expect delays
Date: 2024-Mar-25 to 2024-May-17
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler PM 519-741-2200 x7605
Charles St W And Victoria St S - Partially Closed Unspecified (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Jan-01 to 2024-Dec-31
Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066
FOREST HILL DR - Lane Reduced WESTMOUNT RD E TO BUTTONWOOD DR Reason: Utility Work
Details: lane reduction two way traffic maintained Enova pole reline works
Date: 2024-Feb-11 to 2024-May-09
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
FRANCIS ST S HALLS LANE W TO CHARLES ST W Reason: Other
Details: CLOSURE FOR NEW DEVELOPMENT CONSTRUCTION 30 FRANCIS ST S - TEKTOWER
Date: 2022-Oct-31 to 2026-Sep-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: SPECTRA CONTRACTING 519-594-8868
Fischer-Hallman Rd - Lane Reduced Bleams Rd TO Seabrook Dr Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Apr-03 to 2024-May-03
Contact: Jason Redman - jredman@regionofwaterloo.ca - 519-505-3836
Fischer-Hallman Rd - Lane Reduced Huron Rd TO Plains Rd Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Apr-03 to 2024-May-03
Contact: Jason Redman - jredman@regionofwaterloo.ca - 519-505-3836
HALLS LANE W VICTORIA ST S TO FRANCIS ST S Reason: Crane operation
Details: closure with local access via Victoria St S end only - no through traffic
Date: 2024-Apr-16 to 2024-May-01
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
HALLS LANE W - Partially Closed VICTORIA ST S TO FRANCIS ST S Reason: Other
Details: CLOSURE FOR NEW DEVELOPMENT CONSTRUCTION 30 FRANCIS ST S - TEKTOWER- access via Victoria St end only one way operations NO ACCESS VIA FRANCIS ST END
Date: 2022-Oct-31 to 2026-Sep-30
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
HIGHLAND RD E DELAWARE AVE TO STIRLING AVE S Reason: Road Reconstruction
Details: CLOSURE FOR ROAD RECONSTRUCTION (YEAR 2)
Date: 2024-Apr-01 to 2024-Jun-30
Detour: VIA STIRLING, TO MILL, TO SPADINA
Contact: Steven Ryder 519-741-2200 ext. 7153
Alternate contact: ERIC COSTA (519) 741-2200 EX. 7414
Highway 401 - Lane Reduced King Street Bypass TO King St E W To 401 W On Reason: Road Reconstruction (MTO)
Details: Expect delays up to 15 minutes. Highway 401 Westbound traffic to be reduced from 3 lanes to 2 lanes from Fountain Street to 0.3 kilometre east of King Street. Eastbound traffic to be reduced from 3 lanes to 2 lanes from 1.0 kilometre West of Homer Watson Boulevard to 0.4 kilometre East of King Street. Highway 401 Eastbound to King Street Northbound ramp exit 278B will be closed for a long duration closure. Eastbound traffic will be able to access northbound King Street from the new temporary ramp from 401 eastbound to Shantz Hill Road. Lane Reduction, Traffic Barrels, crash trucks, construction signage. Speed reduction to 80 kilometres per hour. 4 metres for lane 1, 4 metres for lane 2. Ramps closures. The Highway 401 ramp from northbound King Street to westbound Highway 401 is closed for a long duration closure. This closure is to remain in place until May of 2024. April 19, 2024 - April 26, 2024
Date: 2021-Apr-01 to 2025-Jul-31
Contact: MTO 519-873-4372
JOSEPH ST - Lane Reduced VICTORIA ST S TO END Reason: Road Reconstruction
Details: road reconstruction - local access maintained
Date: 2024-Apr-08 to 2024-May-17
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: JEFF RIEDL PM 519-741-2200
King St E - Lane Reduced Sportsworld Dr TO 401 W Off To King St E W Reason: Road Reconstruction (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Mar-18 to 2024-May-30
Contact: Peter Linn - plinn@regionofwaterloo.ca - 519-504-7234
Lancaster St W And Breithaupt St - Partially Closed Unspecified (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Apr-16 to 2024-Jun-30
Contact: Steve Sieunarine - ssieunarine@regionofwaterloo.ca - 519-501-9881
OLYMPIC DR - Lane Reduced HOFFMAN ST TO PATTANDON AVE Reason: Other
Details: soil investigations
Date: 2024-Apr-02 to 2024-Apr-26
Detour: lane reductions
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Ottawa St S And Homer Watson Blvd - Partially Closed Unspecified (Intersection) Reason: Other (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Jan-05 to 2025-Jan-03
Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066
PATRICIA AVE HIGHLAND RD W TO SPADINA RD W Reason: Road Reconstruction
Details: full closure for road reconstruction
Date: 2024-Apr-02 to 2024-Dec-20
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Jeff Riedl PM 519-741-2200 x7812
ROCKWOOD RD - Lane Reduced FISCHER HALLMAN RD TO ERINBROOK DR Reason: Other
Details: temporary construction entrance installation - flagging operations two way traffic maintained
Date: 2024-Apr-17 to 2024-Apr-26
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
SHANLEY ST - Partially Closed DUKE ST W TO WATERLOO ST Reason: Other
Details: lane closed, one way traffic from waterloo st to duke st
Date: 2024-Jan-01 to 2024-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
SHERWOOD AVE SUFFOLK AVE TO BECKER ST Reason: Road Reconstruction
Details: road closure for road reconstruction
Date: 2024-Apr-02 to 2024-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Eric Costa PM 519-741-2200 x 7414
SMITHSON ST BELLEVIEW AVE TO SHERWOOD AVE Reason: Road Reconstruction
Details: closure at Sherwood Ave end only- local traffic only via Belleview Ave end only
Date: 2024-Apr-02 to 2024-Dec-31
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Eric Costa PM 519-741-2200 x7414
Sunny Meadow Crt And Westmeadow Dr - Lane Reduced Unspecified (Intersection) Reason: Site Servicing (REGION)
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Date: 2024-Jan-17 to 2024-Aug-01
Contact: Mike Albrecht - malbrecht@regionofwaterloo.ca - 226-753-9066
WAYNE DR CONWAY DR TO KENORA DR Reason: Road Reconstruction
Details: road closure to Sept 26 2024 for road reconstruction
Date: 2024-Mar-03 to 2024-Sep-26
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler PM 519-741-2200 x7605
WREN CRES KENORA DR TO WAYNE DR Reason: Road Reconstruction
Details: closure at Wayne Dr only no through traffic access via Kenora Dr end only
Date: 2024-Mar-03 to 2024-Sep-26
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler PM 519-741-2200 x7605
TOP
Upcoming Road Closures
Street nameFrom / ToReason / Details
BREITHAUPT ST MOORE AVE TO WATERLOO ST Reason: Road Repair
Start:  Apr 22, 2024
Details: 3 day closure for asphalt work operations and restoration
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
GAUKEL ST KING ST W TO HALLS LANE W Reason: Other
Start:  Apr 25, 2024
Details: INSTALLATIONS ALONG GAUKEL ST NO ACCESS TO HALLS LN
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
GAUKEL ST KING ST W TO HALLS LANE W Reason: Other
Start:  Apr 29, 2024
Details: INSTALLATIONS ON GAUKEL ST - NO ACCESS TO HALLS LN
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
HALLS LANE W WATER ST S TO ONTARIO ST S Reason: Other
Start:  Apr 29, 2024
Details: NO ACCESS TO GAUKEL ST /NO THROUGH TRAFFIC - ACCESS VIA WATER ST OR ONTARIO ST (temp two way) ENDS ONLY
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
HALLS LANE W WATER ST S TO ONTARIO ST S Reason: Other
Start:  Apr 25, 2024
Details: NO ACCESS TO GAUKEL ST /NO THROUGH TRAFFIC - ACCESS VIA WATER ST OR ONTARIO ST (temp two way)ENDS ONLY
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
KENT AVE HURST AVE TO COURTLAND AVE E Reason: Road Reconstruction
Start:  May 13, 2024
Details: Restoration repairs from Q23-062 contract works - closure with local traffic only no through traffic
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Alternate contact: Rob Trussler PM -519-741-2200 x7605
KING ST W ONTARIO ST N TO COLLEGE ST Reason: Catchbasin Work
Start:  Apr 24, 2024
Details: 1 day closure catch basin work, no through traffic, access to Gaukel St via Water/College St end of King St only for the day
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
KING ST W QUEEN ST N TO ONTARIO ST N Reason: Other
Start:  May 8, 2024
Details: Closure for TheMuseum load 3:30 p.m. to 7:30 p.m.
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
KRAFT AVE HAROLD AVE TO FALESY AVE Reason: Sewer Work
Start:  Apr 22, 2024
Details: 1 day closure local traffic only, work at #151 Kraft Ave
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
RIPPLEWOOD CRES CYPRUS DR TO WARREN RD Reason: Sewer Work
Start:  Apr 24, 2024
Details: 2 day closure local traffic only work at #27
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
STRANGE ST WAVERLY RD TO HERLAN AVE Reason: Sewer Work
Start:  Apr 23, 2024
Details: 1 day closure local traffic only work at #55 Strange St
Contact: Stephanie Brasseur 519-741-2200 ext. 7373
Victoria St N - Partially Closed Centennial Rd (Intersection) Reason: Other (REGION)
Start:  Apr 29, 2024
Details: Two-way traffic maintained; expect delays; pedestrian traffic maintained around work zone.
Contact: Steve Sieunarine - ssieunarine@regionofwaterloo.ca - 519-501-9881
WILSON AVE FRANKLIN ST S TO END Reason: Road Reconstruction
Start:  Apr 22, 2024
Details: Road Re-construction - ACCESS TO COMMUNITY CENTRE, POOL AND PARK TO BE MAINTAINED AT ALL TIMES.
Contact: Steven Ryder 519-741-2200 ext. 7153
Alternate contact: Eric Costa 519-741-2200 ext. 7414
TOP

For inquiries regarding road closures, please contact Stephanie Brasseur at 519-741-2200 x 7373 (Transportation Planning).

For information on:

in South Western Ontario, contact 1-800-268-4686.

For information on Regional Road Closures, please visit the following websites: